FARMINGTON — Students from a Farmington High School AP U.S. Government and Politics class sat in on the town's Water Pollution Control Authority on Nov. 10, and Mark Batorski, superintendent of the sewer plant, told them what the plant does on a holiday.
"On Thanksgiving or New Year's Eve, if you're out with friends and family having dinner and the power goes out, this plant still has to be pumping," Batorski said.
If the plant shut off, Batorski said, sewage "will come out on the road in probably a couple of minutes." So the plant on Westerberg Drive keeps a 1,250-kilowatt backup generator, and several of the town's pump stations have their own.
One of those isn't putting out steady power. A portable generator is standing in at the Devonwood pump station while the town gets quotes on new generators there and at the Tunxis pump station. New ones take about 16 weeks to arrive, Batorski said, so the portable will probably be there into February. If a backup fails, a second portable at the plant can be towed out. "We would need too many failures for something to really go down," Batorski said.
Chairman Kevin Ray walked the students through the authority itself. Its members are appointed, not elected, with no limit on how many terms they serve, Ray said, and the authority sets the sewer fee every March. It is $377 a year for a single-family home. A house on a septic tank, Ray said, pays nothing toward the sewer.
The plant met all of its regulatory requirements in October, Batorski reported. "So there's no downtime here ever," Batorski said.
